Project Overview


Client: Verbier Holdings Limited
Contract: JCT Design & Build 2011
Estimated Value: £2m
Completed: January 2016

Information


The new Head Office has been built with a number of modern facilities including; a stylish and contemporary reception area, a passenger lift and feature main staircase, training and meeting suites, private offices, kitchens with social spaces on each floor, comfort heating/cooling system and extensive car parking.

The new Anwyl Group Head Office is set in a prominent location, just off the main A55 in Flintshire. The development has been built using steel frames on pad foundations with structural infill framing, roof/wall cladding and composite upper floors.

The purpose built office was designed with the staff at the forefront. The spacious office features a comfort heating/cooling system which monitors the heat and air levels, filtering in fresh air when required, heating or cooling accordingly. The design features several innovative systems which allow for maximum energy and water saving and as a result the building exceeds building regulations standards for thermal requirements.

The new Head Office was completed in January, 8 weeks ahead of schedule. The Anwyl team moved in on February 1st 2016 and are delighted with their new head quarters.

Prior to the building works commencing Anwyl Construction made contact with local schools and residents to give them an opportunity to express any concern about the works. Not only did this allow them to make informed decisions for their construction programme, it also meant the Anwyl Group could build great relationships with their soon to be neighbours from the outset.

Throughout the duration of the build, Anwyl Construction ensured they stayed close to the local community in Ewloe and have supported a number of community initiatives since beginning the build.

 

The new Anwyl Group Head Office is set in a prominent location, just off the main A55 in Flintshire. The development has been built using steel frames on pad foundations with structural infill framing, roof/wall cladding and composite upper floors.

The purpose built office was designed with the staff at the forefront. The spacious office features a comfort heating/cooling system which monitors the heat and air levels, filtering in fresh air when required, heating or cooling accordingly. The design features several innovative systems which allow for maximum energy and water saving and as a result the building exceeds building regulations standards for thermal requirements.

The new Head Office was completed in January, 8 weeks ahead of schedule. The Anwyl team moved in on February 1st 2016 and are delighted with their new head quarters.

Prior to the building works commencing Anwyl Construction made contact with local schools and residents to give them an opportunity to express any concern about the works. Not only did this allow them to make informed decisions for their construction programme, it also meant the Anwyl Group could build great relationships with their soon to be neighbours from the outset.

Throughout the duration of the build, Anwyl Construction ensured they stayed close to the local community in Ewloe and have supported a number of community initiatives since beginning the build.

 



Other Projects

Hafod Y Gest Extra Care, Porthmadog

The Hafod Y Gest project has comprised the demolition of an existing single storey care home to make way for a new 2 and 3 storey building containing 40 extra care apartments and communal facilities including; commercial kitchen and dining room, hairdressing salon, guest apartments, rooftop conservatory and reception and lounge areas.
Read More

Hafan Cefni Extra Care, Llangefni

Hafan Cefni Extra Care scheme in Llangefni, is a development for Tŷ Glas Housing Society, part of the Pennaf Housing Group in partnership with the Isle of Anglesey County Council. The development provides 63 self-contained apartments, 15 of which are specially dedicated to Dementia care.
Read More

Barncroft Extra Care Housing Development

Barncroft, Extra Care housing development will deliver 21 high quality extra care apartments for over 55’s including support facilities and landscaped gardens for Magenta Living. Located in Pensby on the Wirral Peninsula the scheme will address demand for over 55s accommodation in the Borough.
Read More